Self-Sufficient Pumping Test in Wales

​Overview

PDL was instructed by the client to set up a fully self-sufficient pumping test in two locations in Wales. This included site set-up, welfare, power requirements, fencing, track matting, and waste management. The works involved deepwell and wellpoint pumping using submersible pumps and surface-mounted diesel pumps throughout the tests. The geology of the site consisted of coarse dense SAND to depth, with a groundwater level of approximately 2 m below ground level.

​Our Approach

PDL conducted the pumping test as per the designer’s specification and suitable pumps and pipework were specified to allow for high discharge rates. PDL conducted numerous tests, which included equipment tests, step tests, constant rate tests, and recovery tests as well as groundwater sampling throughout the pumping period. The pumped water was discharged to a soakaway lagoon. Upon completion of the works, PDL decommissioned the wells by installing secure lockable covers to ensure they can be used for future works, and the soakaway lagoons were reinstated according to industry standards.

​Outcome

PDL has since decommissioned and removed all equipment from site, and the use of track matting ensured that the works had minimal negative impact on the land. The works were completed on schedule and to a high standard, reflecting the excellent coordination and planning of the entire team. Given the nature of the works, the project managers were required to respond quickly and effectively to emerging challenges whilst maintaining clear and consistent communication with the client and designers. This approach was key to the successful delivery of the project.